Description
For any biogas valorization unit, it is necessary to dry and pressurize the biogas before its using in an engine, a (micro)turbine or a boiler. The biogas initially saturated with water can damage the equipment (corrosion, heating unit damage...). Therefore, a drying phase is required. The biogas must be pressurized as well to make it usable (maximum pressure) for the valorization equipment.
We provide turnkey implementations, integrating a drying and pressurizing unit. Our units are conceived according to the operating settings and the site’s specific requirements.
Advantages:
- Compact, stand alone turnkey unit, specially developed according to site requirements
- Equipment layout and connection points adapted to the site
- Equipment designed for biogas applications in difficult environments